Aerosys lead times now run to ~Dec 2026. Get an identical custom NCP unit in 2–3 weeks. Learn more →
(385) 319-1559

Faster Availability

Custom NCP Units: Identical to Aerosys, Ready in 2–3 Weeks

Aerosys through-the-wall systems are excellent — but with current lead times running to approximately December 2026, many NYC buildings can’t wait. So we build an identical alternative from National Comfort Products and deliver it in a fraction of the time.

All Guides

Due to high demand, we now custom-build National Comfort Products (NCP) units to match Aerosys systems. Each unit is built to a 36″ × 19″ footprint, with custom grilles and wall sleeves available as needed — a configuration we’ve delivered for hundreds of New York City customers. These custom NCP units ship in approximately 2–3 weeks, compared with Aerosys systems, which currently aren’t available for delivery until approximately December 2026.

Why We Started Customizing NCP Units

Aerosys builds some of the best through-the-wall condensers for NYC buildings, sized specifically for the 36″ x 19″ wall sleeves found in high-rises across the city. The problem isn’t the equipment — it’s the wait. Manufacturer lead times have stretched out to roughly December 2026, and a building with a dead condenser in a south-facing apartment can’t put a tenant on hold for the better part of a year.

National Comfort Products has been in the NYC through-wall market longer than almost anyone, and many buildings already list NCP as an approved brand in their alteration agreements. By customizing NCP units to the same footprint and specifications as the Aerosys system you’d otherwise order, we give you the same fit, the same performance, and a turnaround measured in weeks instead of months.

What We Customize

  • 36″ × 19″ footprint: Built to drop into the standard NYC through-wall sleeve — the same opening an Aerosys unit uses.
  • Custom grilles: Matched to your existing exterior appearance and building requirements.
  • Custom wall sleeves: Supplied when a new or replacement sleeve is needed for the opening.
  • Matched capacity: Sized to the same tonnage as the Aerosys model you were considering, from 1.5 to 2.5 tons.

Turnaround: Weeks, Not Months

A custom NCP unit ships in approximately 2–3 weeks. The equivalent Aerosys system currently isn’t available for delivery until roughly December 2026. For a building trying to get a unit back online before summer, that difference is the entire point. We’ve done this for hundreds of New Yorkers, and the finished installation looks and performs like the Aerosys system it replaces.

Is a Custom NCP Unit Right for You?

If you were planning to order an Aerosys through-wall condenser and the lead time doesn’t work for your timeline, a custom unit built from our National Comfort Products lineup is the fastest way to get an equivalent system installed. Send us your sleeve dimensions, tonnage, and any grille requirements, and we’ll confirm the exact build and price.

Not sure which Aerosys model you’d be matching? Our Aerosys condenser guide breaks down every model by tonnage and application.

Need a Unit Faster Than December 2026?

Tell us your sleeve dimensions and the tonnage you need. We’ll build you a custom NCP unit that matches the Aerosys system — and have it ready in about 2–3 weeks.